Post-Cure

A post-cure is a long, stepped oven cycle that develops a polymer's final wear and chemical performance, printed by the stock makers for polyamide-imide (PAI).

Every Post-Cure article of the Plastic CNC Resources, newest first, each written from published standards, research and makers’ data.

Meaning

A post-cure is a long, stepped oven cycle that develops a polymer’s final wear and chemical performance, printed by the stock makers for polyamide-imide (PAI). Mitsubishi separates it from annealing. Annealing makes a part dimensionally predictable, and post-curing develops the material’s final properties. PAI sold as Duratron PAI typically needs no anneal, because of its dimensional stability, but it can be post-cured.

Stepped Cycle

Quadrant and Mitsubishi print the same steps. The part holds 1 day at 150 °C (302 °F) and 1 day at 215 °C (419 °F). It then holds 2 days at 245 °C (473 °F) and 6 days at 260 °C (500 °F). Heating and cooling run at 10 to 20 °C (18 to 36 °F) per hour. The cycle is given for parts up to 12 mm (0.47 in) in wall thickness. The holds alone take 10 days. Adding the ramps computed from the printed rates gives about 11 to 12 days per load.
Read More

Surface Layer

In air the surface turns dark brown from minor oxidation. That oxidized layer is what gives the wear resistance. Finishing after the post-cure removes no more than 0.5 mm (0.020 in) of it. A part that needs more stock removed than that is planned so the cure comes after the heavy cuts.

Order of Operations

For close tolerances, Mitsubishi recommends doing the post-cure before final machining. The sequence is rough, post-cure and finish with a light cut that stays inside the 0.5 mm (0.020 in) limit. An inspection record notes the cycle, because a later cut would remove the cured layer.

Drawing Wording

“Heat treated” on a drawing can mean a stress relief, a post-cure or a drying step. A drawing that names the post-cure and its stage lets a supplier book the oven days. It also lets the supplier plan the finishing pass and the inspection after it.

How Long Resting, Annealing and Drying Add to Machined Plastic Parts

In a machined plastic order the cutting takes minutes, while resting, drying and heat treatment take days, so the drawing sets the lead time.

Where the Calendar Goes in a Machined Plastic OrderMost of the elapsed time in a machined plastic order is spent on stock preparation, resting, heat treatment, drying and measurement at a controlled temperature, and the cutting is a small fraction. When a part needs none of those steps, it goes from blank to finished in the machine time plus setup and deburring.

Inspecting a Batch of Machined Plastic Parts Before It Ships

Inspecting machined plastic means stating the temperature, the probe force and the sample size, because a plastic part changes with all three.

How to Inspect a Batch of Machined Plastic PartsInspect the batch at a stated temperature, with a low-force or non-contact method for soft or thin parts, on a sample whose size is chosen in advance, and record the conditions with the results. Those four elements separate a measurement that can be repeated from one that cannot.

Annealing Machined Plastic Parts Between Roughing and Finishing

Annealing between roughing and finishing trades oven days for flat, stable parts, and it pays only when stress, shape or tolerance demand it.

When a Machined Plastic Part Needs AnnealingA machined plastic part needs an intermediate anneal when it has tight tolerances, an asymmetric shape, or a large share of its blank removed, and when it does not need one the stock maker has already done the work. Ensinger states the starting condition: its semi-finished products are always annealed after production, which is why a first cut can start without a stress-relief step.

Request a Plastic CNC Quote

Send the 2D drawing and the 3D file, with the quantity and the stage of the project. An engineer replies within 1 working day.

The quote form, the mutual NDA and the private folder for your files are on Protolis Atelier, with Plastic CNC chosen.

Request a Quote