Meaning
Rest time after machining is the stated wait between the last cut and inspection. It keeps cutting heat and early stress release out of the reading. The thermal expansion and drilled hole articles in these resources both ask for it on the drawing. Without it, two measurements of one part can differ by more than its tolerance.Reason
A fresh plastic part is still changing. Heat from the cut leaves it warm, so the first measurement reads large. Stress released by the removal of material shifts it over hours. Moisture alters its size over days to weeks, at a rate the sheets print as mass, not length. Mitsubishi’s turning tips add that most diameters grow after cutting.Read More
Overlapping Effect
All three effects can overlap on one freshly cut part. A first-article measurement taken at the machine, warm and fresh, is not the size the part keeps. One taken after rest, at the stated temperature, is. A hole is the clearest case. It moves with heat and with stress, so the hole call-out carries both a measurement temperature and a rest time.Drawing Note
The thermal expansion article gives a model line. Dimensions apply at 20 °C (68 °F) after 24 hours at that temperature. The line fixes the rest and the soak at once. It also gives a supplier and a buyer the same starting point for any later dispute.Record Entry
The inspection article treats time since machining as the third condition of a plastic measurement, after temperature and probe force. The record states whether a part was measured as machined, after a rest, after drying or after conditioning. A reading without that line cannot be compared with the next one.